For diesel engines | Di12 | ENGINE TREATMENT Di12
RVS Master Di4, Di6, Di12, Di25, Di35, Tractor for worn diesel engines, RVS Master Ga3, Ga4, Ga6 rebuilding petrol engines and their components. The numbers next to Di 4, 6, 12, 25, 35 and Traktor 35 indicate the amount of oil in the engine according to the manufacturer. For example: Di4 for engines up to 4 litres; Di6 up to 6 litres of oil in the sump, etc. Correspondingly Ga3 up to 3 litres, Ga4 up to 4 litres, Ga6 up to 6 litres. RMS blends do not need to be used at every oil change as they are not an additive to the oil.
"The RVS Master gives the engine four effects:
- Fuel consumption is reduced by 5-15%;
- CO/HC emissions are reduced by 50-70%;
- Increased engine power;
- Increased compression in the cylinders.
Before use RVS-master, we recommend flushing the engine with RVS-master Mf-5 production engine flusher (especially for diesel engines this is essential).
Engine flushing:
The Mf-5 bottle contains the same material as the main packs, as well as rubber softeners. If the inside of the engine is reasonably clean, the flusher starts to rebuild it.
Shake the mixture in the MF-5 bottle (20-30 seconds) to remove any residue and pour it into the crankcase of a warm engine.
Immediately after starting, drive in normal mode for 40-50 km, then switch off the engine (more is possible).
The total number of kilometres the car can be driven without changing the oil is 200-300 km, up to a maximum of 500 km. Then change the oil and oil filter.
After flushing the engine with Mf-5, select RVS-master packaging according to the type of engine (carburettor or diesel) and the amount of crankcase lubricant specified by the manufacturer. Two packages are required for a complete engine rebuild. For an engine with a mileage of up to 50 000 km, one pack is sufficient. The parameters of a worn engine, after a complete and correct treatment, are restored to the factory values and remain unchanged over 100 000 km.
Attention: If the engine has been overheated, run without oil, or has technical faults such as a burnt valve, a broken ring, a pronounced crankshaft vibration, or broken deposits or camshaft bushes, RVS-master the use of the product is not recommended.
Instructions for use:
1. First engine treatment:
The engine is warmed up to operating temperature.
Select the engine for that engine RVS-master the packaging of the product and the vial removed from it.
The vial must be at room temperature and shaken well (20-30 seconds).
Pour the contents of the bottle into the engine and start it immediately. Allow the engine to idle for 15 minutes.
Then switch off the engine for 1-2 minutes. Immediately after starting, run the car for 30-40 km without switching off the engine, avoiding heavy loads.
After 30-40 km, it is allowed to switch off the engine.
After 400-500 km (no matter what the period, whether a day, two days or a week, the sooner the better, but avoiding sudden engine overloads), a second treatment is immediately carried out.A minimum of two packages is required.
2. Second engine treatment:
The second engine treatment is carried out after 400-500 km (8-10 mph for tractors), in the same way as the first treatment, in the same lubricant.
The parameters of a worn out engine are fully restored after 1500-2000 km (or 20-50 mph) after the last use of the RVS-master product.
It is recommended to carry out an engine diagnostic after the treatment, to adjust the changed parameters.
3. A third use of the RVS-master may be necessary if the engine is found to be quite worn.
Additional instructions for SKANIA, RENAULT, KAMAZ, MAZ, MTZ and other vehicles,
engines with centrifugal oil cleaning
Engine treatment RVS-master output is carried out only after flushing the engine with RVS-master Mf-5 and after replacing the old lubricant and cleaning the centrifuge.
The first treatment is as follows:
Optional RVS-master the packaging of the output according to the amount of lubricant in the engine by factory/manufacturer.
Only fill the engine with new lubricant up to the lower limit of the dipstick.
Take an additional 3-5 litres of warm ointment and pour it into the bottle from the packaging after shaking it well.
Shake the lubricant thoroughly and pour it into the warm engine.
After starting the engine, idling is allowed for 15 minutes. Switch off for 1-2 min.
Immediately after starting to run for 30-40 km. using the 80% for its power.
After 400-500 km or more (8-10 moto/hr), a second treatment is carried out, similar to the first treatment, but with the centrifuge cleaned and shut down or replaced.
The centrifuge is started after 400-500km or 3-4 motos/hour. No oil change required. If there is a shortage, top up to normal.
Changes and signs of engine operation may occur during processing:
- Flushing the engine with a flusher MF-5the oil pressure light may come on or start flashing after a while.
Conclusion: the oil filter is clogged. Change the oil and oil filter immediately and start the first engine treatment RVS-master production.
2. Engine power may drop.
ISwada: There's nothing wrong with that, it's temporary. It will go up during further processing.
3. If after the first or second treatment there is a significant increase in lubricant consumption and smoke emissions.
Conclusion: the engine has a history of overheating and fried oil rings. The oil rings will need to be replaced after full treatment.
Properties of the protective layer of metal ceramics:
absolute adhesion to metals at the molecular level, which prevents surface delamination;
a uniform coefficient of linear thermal expansion relative to the metals on which it is formed, so that it does not break or delaminate on heating and does not delaminate on heating and cooling;
Impact resistance up to 50 kg/mm2;
coefficient of friction - 0.003-0.007!;
resistant to oxidation and corrosion (chemically inert);
Fire resistant (decomposition temperature of about 1700 degrees)
Protects surfaces against hydrogen embrittlement; Protects against electrochemical corrosion (dielectric)
Safety and storage instructions:
Store below +400 C;
In case of contact with skin, wash with warm water and soap;
Irritation may occur if contact with eyes - rinse with water. If irritation persists, seek medical attention;
In case of contact with the gastrointestinal tract, rinse mouth and seek medical attention. Do not induce nausea;
Keep out of the reach of children.
- Fast delivery 0 to 4 working days.
- All goods are supplied only from official dealers.
- Send to to Smartpost, Omniva, LP Express, Venipak post offices.
- Oil and filter change in Vilnius, Žirmūnų g 54a
- Free pick-up in Vilnius.
- Free delivery for purchases over €120.
Aprašymas
"RVS Master for diesel engines | ENGINE TREATMENT Di12
A compound that rebuilds and restores internal combustion diesel engines by creating a protective metal ceramic film on metal surfaces that are rubbing. The thickness of the film depends on how badly the engine is worn and the extent of wear on the engine components. Worn parts are restored to their factory parameters. The application of this product results in increased engine compression and the oil pressure is restored to the factory level. The metal ceramic film has an extremely high wear resistance, making the engine much longer lasting and the parts more resistant to wear. This increases the longevity of the engine by several times. RVS blends do not need to be used at every oil change.

Only logged in customers who have purchased this product may leave a review.













Reviews
There are no reviews yet.